DOD SR400D Dokumentacja Strona 93

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 244
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 92
85
b. Tighten the screw cap clockwise onto the shut-off
valve (Fig. 39).
Fig. 39. Wand Assembly.
3. Pump Lever
a. Place lever handle (Fig. 40-C) onto the shaft (Fig.
40-A). Align bolt holes and install the two bolts
(Fig. 40-E) and washers (Fig. 40-F); then tighten.
To install pump lever on the opposite side,
remove the stop plate (Fig. 40-D) and washer,
install the pump lever as above. The stop plate
(Fig. 40-D) should be mounted on the inner bolt
hole, with the closed end of the stop plate pointing
downward on the opposite side of the pump shaft.
Przeglądanie stron 92
1 2 ... 88 89 90 91 92 93 94 95 96 97 98 ... 243 244

Komentarze do niniejszej Instrukcji

Brak uwag