DOD SR400D Dokumentacja Strona 153

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 244
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 152
145
 19. As the engine starts, gradually push in choke.
(Omit this step if the engine is already warm.)
OPERATING PROCEDURES
 20. Check the boom pressure gauge located below the
formulation selector valve. (Should be at 10 psi for
standard use.)
 21. Adjust air pressure by increasing or decreasing
engine speed with the manual friction slide control
lever located beneath the choke knob.
 22. Place formulation selector switch on the control
box to "SPRAY."
 23. Turn formulation selector valve to "SPRAY."
 24. Place the output switch on the remote control in
the "ON" position.
 25. Select pesticide output, using the pesticide label,
with coarse flow rate knob on control box.
Numbered 1-4.
 26. Loosen lock nut below fine flow rate knob on
control box.
 27. Set precise pesticide flow rate.
 28. Tighten lock nut.
 29. You are now ready for ULV spraying.
Przeglądanie stron 152
1 2 ... 148 149 150 151 152 153 154 155 156 157 158 ... 243 244

Komentarze do niniejszej Instrukcji

Brak uwag