72
k. Rotate the pleated hose (Fig. 19-13) so the
marks are in the positions shown in the
illustration. With the pleated hose in this position,
make sure the control handle is vertical and
tighten it down firmly. Push the stub (Fig.20-14)
into the tank base. Fit the union nut (Fig. 20-2)
and screw it in tightly.
l. Unscrew the hose clamps (Fig. 21-15) and
remove the bellows (Fig. 21-16) (hose clamps
are used again). Unscrew the tank cap. Pull the
strainer (Fig. 22-17) off of the hose (Fig. 22-18),
push the reducer (Fig. 23-19) out of the tank from
the inside and remove it together with the hose
(Fig. 23-18).
m. Join up the two half-shells (Fig. 24-20) and
secure them to the tank and fan housing with the
hose clamps (Figs. 21-15, 24-15). [IMPORTANT
NOTE: The completed shell is larger in diameter
at the top compared to the bottom. Use the larger
hose clamp on top and the smaller hose clamp
on the bottom (Fig. 21-15, top and Fig. 21-15,
bottom.)]
Komentarze do niniejszej Instrukcji